GCI - Solutions in the 1950's
Year | Location | Solution Application | Solution Description |
1952 | Los Angeles, CA | Patented Track Solution | Food processing solution consisted of 700 lineal ft. of patented track monorail system including 10 track switches and numerous track curves and monorail rack carriers. |
1953 | Palmdale, CA | Patented Track Solution | Aerospace manufacturing solution consisted of four (4) direct interlocking double girder 3-runway patented track cranes operating along 9 x 340 ft patented track runway system. Three (3) cab operated hoist/trolleys operated between the cranes. |
1956 | Anaheim, CA | Automated Dispatch Solution | Dispatching solution consisted of an automated monorail system consisting of approximately 800 lineal feet of patented track, 1 monorail track switch, numerous incline/decline sections of track.System included 25 custom monorail carriers. |
| 1958 | San Diego, CA | Chemical Process Solution | Military maintenance support solution consisted of five chemical process lines. Fourteen (14) patented track cranes operated throughout the process lines. |
| 1958 | Los Angeles, CA | Patented Track Solution | Automotive tire processing solution consisted of 540 lineal ft. of patented track monorail system including 14 track switches and numerous track curves and monorail carriers. |